Water management in African gold mining under harsh conditions.
One of the largest gold mines in Africa was facing a severe challenge of water logging at its site. Regular pumps deployed earlier failed frequently due to:
The mine struggled with flooded pits and halted operations, leading to delays and losses. The inability to manage seepage and groundwater inflow jeopardized not only productivity but also worker safety and overall mine sustainability. With operations stuck and costs rising, an urgent dewatering solution was critical.
3 Units of CAP 200HH
Ensure high-capacity, reliable dewatering for continuous mining operations
Reduce maintenance and operational costs
Deliver rapid mobilization and installation for minimal downtime
Support safe and sustainable mining practices
Within 24 hours of mobilization, our team inspected the site and conducted a detailed water report to assess the seepage and inflow conditions. Based on the findings, 3 CAP 200HH pumps with special metallurgy (CD4MCu) were deployed to withstand abrasive and corrosive mining water. The pumps were strategically installed to deliver the required high flow rates, ensuring efficient water evacuation from the mine. Within the next 24 hours, a successful dewatering plan was in full execution, restoring operational normalcy.
Gold mining operations in Africa demand robust and efficient solutions to manage water logging and harsh working conditions. With strategic deployment of Autoprime Pumps, dewatering challenges were overcome, enabling safe, reliable, and cost-effective mining operations.
Future dewatering strategies in mining should focus on: